Noida International Airport: Key features
Prime Minister Shri Narendra Modi will lay foundation stone of Noida International Airport. The event will happen in Jewar, Gautam Buddha Nagar, Uttar Pradesh on 25 November 2021. With this, Uttar Pradesh is poised to become the only state in India to have five international airports.
The development of the airport is in line with the vision of boosting connectivity and creating a future-ready aviation sector. A special focus of this grand vision has been on the state of Uttar Pradesh (UP) that is witnessing the development of multiple new international airports including the recently inaugurated Kushinagar airport and the under construction international airport at Ayodhya.
Are our phones really designed to slow down over time? Experts look at theย evidence
Key features of Noida International Airport
It will be also second international airport to come up in Delhi NCR which is expected to reduce the burden of IGI Airport. It is conceptualised with an integrated multi modal cargo hub, with a focus on reducing the total cost and time for logistics. The dedicated cargo terminal will have a capacity of 20 lakh metric tonne, which will be expanded to 80 lakh metric tonnes.
Noida and Delhi will be connected to the airport through hassle free metro service. All major nearby roads and highways like the Yamuna Expressway, Western Peripheral Expressway, Eastern Peripheral Expressway, Delhi-Mumbai Expressway, and others will be connected to the airport. The airport will also be linked to the planned Delhi-Varanasi High Speed Rail, enabling the journey between Delhi and airport in only 21 minutes.
The design of the airport is focussed on low operating costs and seamless and fast transfer processes for passengers. The airport is introducing a swing aircraft stand concept, providing flexibility for airlines to operate an aircraft for both domestic and international flights from the same contact stand, without having to re-position the aircraft. This will ensure quick and efficient aircraft turnarounds at the airport, while ensuring a smooth and seamless passenger transfer process.
It will be Indiaโs first net zero emissions airport. It has earmarked dedicated land to be developed as forest park using trees from the project site. NIA will preserve all native species and be nature positive throughout the development of the airport.
Status of Noida International Airport
The development of the first phase of the airport is being done with a cost of over Rs 10,050 crore. Spread over more than 1300 hectares of land, the completed first phase of the airport will have a capacity to serve around 1.2 crore passengers a year and work on it is scheduled to be completed by 2024. It will be executed by the international bidder Zurich Airport International AG as concessionaire. The groundwork for the first phase on land acquisition and rehabilitation of the affected families has been completed.
Observer Voice is the one stop site for National, International news, Editorโs Choice, Art/culture contents, Quotes and much more. We also cover historical contents. Historical contents includes World History, Indian History, and what happened today. The website also covers Entertainment across the India and World.
Follow Us on Twitter, Instagram, Facebook, & LinkedIn