Barauni Plant of HURL commences Urea production

Barauni Plant ofย Hindustan Urvarak & Rasayan Limited (HURL) commences urea production.ย The country has achieved another milestone by setting up a new ammonia urea plant at Barauni which started urea production yesterday. The state-of-the-art gas-based Barauni Plant is part of the initiative taken by the Government to revive the closed urea units of Fertilizer Corporation of India Ltd. (FCIL) and Hindustan Fertilizers Corporation Ltd (HFCL) in order to achieve self-sufficiency in urea sector. Revival of closed units of FCIL and HFCL had been the top priority agenda of the present Government to augment the availability of domestically produced urea. Government-mandatedย Hindustan Urvarak & Rasayan Limited (HURL) to revive the Barauni unit with an estimated investment of Rs. 8,387 crores with a urea production capacity of 12.7 LMTPA.

HURL, incorporated on 15thย June 2016 is a Joint Venture Company by Coal India Limited (CIL), NTPC Limited (NTPC), Indian Oil Corporation Limited (IOCL) and FCIL/HFCL mandated to revive Gorakhpur, Sindri and Barauni units with an estimated investment of Rs. 25,000 crores. The start of all three plants of HURL will add 38.1 LMTPA indigenous urea production in the country and help to realize the vision of the Prime Minister to make India โ€˜Aatmanirbharโ€™ (self-reliant) in urea production. It is one of the largest fertilizer manufacturing units in India, for which the foundation stone was laid by Prime Minister Shri Narendra Modi. The Project will not only improve the availability of fertilizer to farmers but also give a boost to the economy in the region including the development of infrastructure like roads, railways, ancillary industry etc. besides ensuring food security to the nation.

https://observervoice.com/25-july-remembering-phoolan-devi-on-her-punya-tithi-8620/

HURL Plants has various unique features like a state-of-the-art blast-proof control room equipped with DCS (Distributed Control System), ESD (Emergency Shutdown System) and environment Monitoring Systems etc. It also has Indiaโ€™s First Air Operated Bullet Proof Rubber Dam of 65 meters in length and 2 meters in height. There is no offsite wastewater disposal in these plants. The systems are operated by highly motivated, dedicated, well-trained Operators. The facility integrates the worldโ€™s best technologies aiming to meet the demand for urea in the states of Uttar Pradesh, Bihar, Jharkhand, Chattisgarh, Madhya Pradesh, West Bengal and Odisha. Apart from urea supply, the project will also help to develop small and medium-scale industries/vendors around the manufacturing unit. There will be a lot of entrepreneurship activities around the hub and it will further boost employment generation. The operation of plants will lead to making the country self-reliant in urea fertilizer, Saving in Foreign Exchange due to reduced imports and a giant step towardsย โ€œAtamnirbhar Bharat in Fertilizersโ€.ย It may be noted that the Gorakhpur plant of HURL was already commissioned in Dec 2021 and Sindri Plant is likely to be commissioned shortly.


Observer Voice is the one stop site for National, International news, Editorโ€™s Choice, Art/culture contents, Quotes and much more. We also cover historical contents. Historical contents includes World History, Indian History, and what happened today. The website also covers Entertainment across the India and World.

Follow Us on Twitter, Instagram, Facebook, & LinkedIn

Back to top button