PM GatiShakti National Master Plan
The Prime Minister launched PM GatiShakti-National Master Plan (NMP) for infrastructure development in October 2021 with the objective to bring different Ministries/ Utilities & infrastructure planning under a single unified vision, across all sectors such as Highways, Railways, Aviation, Gas, Power transmission, Renewable Energy etc. Such an unprecedented initiative outlines the vision for infrastructure development across the country including โPowerโ in general and โTransmissionโ in particular, which strengthens the energy lifeline of the country.
It would be a game changer providing multi-modal connectivity of infrastructures to various economic zones by leveraging technology extensively including spatial planning tools with indigenous ISRO imagery developed by BISAG-N, Gujarat, fulfilling the objective of โAtmanirbhar Bharatโ.
As country takes strides towards strengthening its infrastructure, power plays a pivotal role in development of infrastructure and the economy. The PM GatiShakti NMP portal provides “One-click Comprehensive viewโ to steer and simplify the planning & implementation process by reduction of time and cost of implementation in Power transmission projects.ย It would also aid in improving logistics efficiency through single digital platform & multi-modal portal.
In development of Power Transmission projects, PM GatiShakti NMP portal shall play critical role in Planning, Tendering, Implementation and Approval stages.ย At planning stage, user shall identify the tentative line length of the planned transmission line and location of the substation(s). Under tendering/bidding stage, the survey agency will utilize the portal for identifying the best techno-economical route. During Implementation stage,ย based on actual conditions, finalization of the transmission line route and location of substation shall be done. Lastly, approval stage is envisaged for single window clearance.
PMโs call for โOne Sun, One World, One Gridโ has set the tone for strong and reliable transmission system which will support Indiaโs Renewable Energy (RE) ambitions along with supplementing growth of renewables globally. Power transmission has been an enabler in the RE story and various key Power projects are enabling RE evacuation across country.ย Of these projects, Ministry of Power has undertaken 9 Highย Impact Power projectsย (10 no. of transmission lines)ย spanning over 6 RE rich States Viz. Rajasthan, Gujarat, Madhya Pradesh, Maharashtra, Karnataka, Tamil Nadu. The requisite details of projects have been mapped in the portal, by creating a separate layer of ISTS transmission lines incorporating basic data (like Line route, tower location, location of substation, name of owner etc.).
In line with goal of PM GatiShakti, entire โexistingโ Inter State Transmission System (ISTS) lines have been mapped on the portal spanning across length and breadth of the country. Also, 90% โunder constructionโ ISTS lines have also been integrated in the portal and remaining 10% ISTS lines are to be integrated after finalization of route survey by respective Transmission Service Providers.
PM GatiShakti NMP portal will ultimately aid in solving problems of development of infrastructures in the country by building secure, sustainable, scalable and collaborative approach towards infrastructure planning for seamless connectivity to economic zones. Now, with PM GatiShakti NMP portal and onset of more holistic & comprehensive approach towards planning for Ministries, Utilities and Infrastructure, we as a nation are well poised to take giant stride towards evolving into 5 trillion dollars economy while enabling reliableย โPower to Allโ.
Read Also: India observes the 27th Global Ozone Day
Observer Voice is the one stop site for National, International news, Editorโs Choice, Art/culture contents, Quotes and much more. We also cover historical contents. Historical contents includes World History, Indian History, and what happened today. The website also covers Entertainment across the India and World.